<samp id="rmi44"></samp>
<table id="rmi44"><option id="rmi44"></option></table>
    <table id="rmi44"><strike id="rmi44"></strike></table>
    <table id="rmi44"><noscript id="rmi44"></noscript></table>
    <p id="rmi44"></p>
  1. <acronym id="rmi44"><strong id="rmi44"></strong></acronym>
  2. <table id="rmi44"><ruby id="rmi44"></ruby></table>
      <pre id="rmi44"><del id="rmi44"><menu id="rmi44"></menu></del></pre>
    1. Location:Home > News Center

      Site installation of the 8 bulk material handling machineries for Jordan completely finished

      Date:Feb 21, 2020 9073 Font scaling:

      Before Spring Festival, site installation of the total 8 bulk material handling machineries (including 4 stackers and 4 reclaimers) contracted and manufactured by DHHI for Guangdong Thermal Power Jordan Project was successfully completed. The first set of stacker has been load tested, the first two sets of reclaimers are currently under electrical commissioning, and the other 5 machineries are in the process of electrical installation. During Spring Festival, the mechanical, electrical and after-service personnel of DHHI still stayed on the site to assure handover of the equipment at an early date.


      ?

      COPYRIGHT? 2016 DALIAN HUARUI HEAVY INDUSTRY GROUP CO.,LTD.   辽ICP备19019373号-1

      手机炸金花下载